Week 2, Wednesday

General

HAB experiments from other teams are being looked at so as to take notes on what to expect, what to do, and what not to do at the balloon launch.


CAD

The front component for the camera casing has been modified to include a hole for the power button, display screen, and power light and has been saved as an stl file. While the original plan was to print a copy of the updated version and then print the rest once the dimensioning of the first checks out, it will be more time and cost efficient to cut out the hole in an existing component. A front-view drawing of the component with dimensioning has been compiled through Fusion 360. The hole will be added to a preexisting copy tomorrow.


Hardware/Software

A circuit board has been successfully printed here in the STEM Research Center. The code for the opening and closing of the motors works, but a timeout code is being developed should the limit switches fail.

Cameras

Tests are being run to determine the optimal framerates and tensile strength of the cameras. The cameras have also been updated.

Comments

Popular posts from this blog

Camera Field of View Test

Camera Test in the Sun

1 June 15