Week 2, Tuesday
The Beta Taurids are normally active from June 5 to July 18. However, we may not be ready to launch the balloon by then.
CAD
A model of the Hero3+ camera and its standard housing was downloaded to Fusion 360 and the model for the upper casing was updated to include holes for the Hero3+'s power button and display screen. The CAD team also continued practicing using the modeling software.Circuit/Software
All temperature sensor errors have been resolved and the temperature coding has been integrated into the main file. The motor for one of the sliding covers is operating successfully. Instead of soldering the components directly onto the board, screw-down terminal blocks will be used for peripheral connections including sensors, switches, and motors.
Comments
Post a Comment