Week 1, Thursday

Software/Circuit

  • Team was able to run the motor from the code
  • Problems arose with the full implementation of the 3 temperature sensors
HAB GitHub

Camera

  • The cameras are running from the external batteries to see how long the can last in optimal conditions.

CAD

  • Full team brainstorm session in the conference room
  • complete design was looked at by everyone
  • problems and solutions mentioned:
    • suspension support cords
    • decoupled landing impact rods
    • landing feet
    • Looking for a way to push down on the slide/lid to keep a more sterile closing
      • arm which is geared to the main thread gear, driven slower into the opposite direction to push down

Comments

Popular posts from this blog

Camera Field of View Test

Camera Test in the Sun

End of Week II of Summer 2 - 7/12/2018