Zachary touched up the poster, Ian finalized the abstract, and Sadik is trying to graph the test flight data. We also measured the parachute-to-balloon cord and the parachute-to-package cord, which were 37' and 29' 4", respectively. In the meantime, the biologists took our remaining 5 Petri dishes to sterilize them and add agar for the launch. This leaves us with one Petri dish for testing.
Yesterday, we finished rendering the payload in Fusion 360. This included two Petri dish assemblies, two Spot GPS holders, one APRS holder, one battery holder with two batteries and three camera casings (two in the box, one in the lid). The circuit board has not been included yet; we're still waiting for the digital pressure sensor and thermistor.