December 4, 2017

December 4, 2017

Replication Update:

Grecia:  The cameras were connected to the batteries with their corresponding cables. The payload was built back up the way it was before the launch.


Jonny: The board was turned on a long with the spot GPS to make sure that they still worked. The only thing that did not work was the APRS. The batteries were dead, and now we are waiting for the lithium batteries to come so that the "Replication Test" can be run. 


Comments

Popular posts from this blog

Camera Field of View Test

Camera Test in the Sun

End of Week II of Summer 2 - 7/12/2018