WEEK TWO: June 1, 2016

1. Worked on error handling. (Nick, Patrick, Peter)

2. Worked on checklists. (Sofia)

3. Design partitions for payload. Measure dimensions of sections. New payload box inside dimensions are 11.43cm Height X 28.7cm Width X 18.85cm Depth.  (Patrick, Sofia, William)

4. Test GPS lock of circuit GPS LS20031 from within the payload box. Data sheet for the GPS is here. (Everyone) FAILED 1st try due to hardware issue. Tentative SUCCESS!! Works inside the payload box with the "upside down" orientation. We established a connection first and then closed the payload box.

5. Test pressure sensor outside. (Everyone) SUCCESS

6. Test external thermistor outside. (Everyone) SUCCESS

7. Test internal thermistor outside. (Everyone) SUCCESS

8. Test clock outside. (Everyone) SUCCESS

9. Test accelerometer outside. (Everyone) SUCCESS